Sourcing note
Buying Custom Metal Parts from China: What to Check Before You Pay
A factory and a trading company look identical on a website. The difference shows up at the first difficult tolerance, at the first change request, and at the first claim. This is the checklist we would use if we were…
1. Factory or trader? Three questions settle it
- Ask for the machine, not the building. Request a short video of the specific press, laser or CNC that will run your part, with the part or the die visible. Traders cannot film a machine they do not own.
- Ask who signs the first article. A factory names a quality engineer and a measurement method. A trader forwards your email to someone else.
- Ask what they will not make. A factory knows its process limits and says so before quoting. A broker quotes everything.
2. The documents that should arrive with the parts
If a supplier cannot produce a dimensional report for the first article, the tolerance on your drawing is a promise, not a measurement.
Whether the parts are copper busbars or sheet metal brackets , ask for the same document set for the first article and for each batch.
| Document | What it proves | When to insist |
|---|---|---|
| Mill certificate EN 10204 3.1 | The actual heat of material used, not a generic sample | Any structural or safety part |
| Dimensional report | Measured values against your drawing, with the sample size stated | Every first article and every batch you sign off |
| First article inspection (FAI) | Full feature-by-feature verification of the first part | New tooling or a new supplier |
| Coating report | Plating or coating thickness, adhesion and salt spray hours | Any visible or corrosion-critical finish |
| RoHS / REACH declaration | Compliance of the materials and finishes used | Anything sold into the EU |
| Certificate of conformity | Statement that the delivered lot matches the drawing | Every shipment, as a baseline |
3. Tooling: who owns it, who pays for it
- Tooling is normally paid once, before production, and is separate from the unit price – ask for it as its own line item.
- Ownership should be in writing: if you pay for the die, the die is yours, and it should be usable by another supplier if you ever move.
- Ask for the tool life assumption behind the quote. A die quoted for 100,000 shots is not the same tool as one quoted for 1,000,000.
- Ask what a design change costs after the die is cut. A supplier who says “free” has priced the change into your unit price.
4. Payment and risk
- Typical terms are a deposit with the balance against the inspection report or the bill of lading – not the full amount up front for a first order.
- Do not pay a new supplier in full before the first article is approved. Paying for a sample and its inspection is cheap insurance.
- Agree who pays for return freight on a failed inspection before the order, not after.
- For repeat orders, keep the approved first-article report as the reference. It is the only objective answer to “it was within tolerance last time”.
5. What a good first order looks like
If a supplier skips step two and goes straight to a price, the price will change later – usually after the die is cut.
- Send the drawing with material, finish, quantity and the tolerance that actually matters.
- Receive a DFM review that names the features likely to cost money – before the price.
- Approve a first article against a written dimensional report.
- Release the balance against an inspection report that matches that FAI.
Frequently asked questions
- Is it cheaper to buy from a factory than a trading company? — Usually, but not always and not by much on simple parts. The bigger difference is what happens when something goes wrong: a factory can rework at the source, a trader has to negotiate with a third party.
- How much should a first sample cost? — A sample is normally charged at the unit price plus tooling if tooling is required. Free samples with expensive tooling behind them usually mean the tooling cost is hidden in the production price.
- What lead time should I expect? — Samples run in days to two weeks depending on process and finish; production after approval runs in weeks. Ask for the lead time to be split the same way the price is: sample, then production.
- Should I use an inspection agent? — For a first order with a new supplier, a third-party pre-shipment inspection is a reasonable cost. For repeat orders with a supplier that already sends dimensional reports, it is often unnecessary.
Related
- Quality and certificates — What is checked at each stage and which documents you can ask for.
- Design guides — Six guides to the decisions that change the price.
More guides on this
- CNC machining: setup count and the price it drives — The companion note for the next decision on the same part.
- Die casting: wall thickness, draft and cost — The companion note for the next decision on the same part.
- Busbar weight and current calculator — Size a copper busbar before you specify it.
Send the drawing and test us on the first reply
You get a named engineer, a written DFM review and a price with the tooling split out – within one business day on weekdays.