Automotive bracket: what a PPAP-ready stamping actually needs
A bracket that holds a sensor is not a bracket. Function, datum scheme and the paper trail decide whether the part is released, and the drawing usually starts one revision short of that.
The figures describe the representative case discussed in this note, not a specific customer order.
| Volume | 8,000 per year with a 30% forecast swing |
| Material | 2 mm mild steel, two weld nuts, zinc-nickel finish |
| Route | Stamping, two bends, projection welding, plating |
| Control that decides it | Datum scheme that survives coating, and flatness called on the bare face |
The situation
Sensor bracket, 2 mm mild steel, two bends, two weld nuts, zinc-nickel finish. Volume 8,000 a year with a 30% forecast swing. The customer’s drawing gave the outline as the datum and a flatness call on a face that is coated afterwards.
What we changed before quoting
- Datum – moved from the outline to one of the mounting holes plus a face, so the fixture and the CMM agree.
- Flatness versus coating – the flatness call moved to the bare face, before plating, with the coating thickness stated separately.
- Weld nuts – specified projection weld with a pull-out value, rather than “two nuts welded”.
- Bend relief – added at both ends of the long bend, which had been tearing on the first trial batch.
- Coating masking – the two earth points stay bare; everything else is coated.
What it costs to skip this
| Shortcut | What happens later |
|---|---|
| Datum is the outline | Fixture and CMM disagree; every first article becomes an argument |
| No bend relief | Tearing at the bend end, found at the first batch, die already cut |
| Flatness after coating | Coating thickness eats the tolerance; parts fail on a feature that was never machined |
| Vague hardware note | Weld nuts chosen by the shop, pull-out untested, no record |
The document set that ships
- First article inspection report with measured values against the drawing
- Mill certificate EN 10204 3.1 for the heat used
- PPAP package where required: process flow, PFMEA, control plan, MSA
- Coating report – thickness, adhesion, salt spray hours
- Certificate of conformity per delivery
Related
- Metal stamping design — Thickness, bend radius and station count before the die is cut.
- Quality and documents — What is checked at each stage and what ships with the parts.
- Sheet metal brackets — The part family this note is about.
Send the bracket drawing and the release requirements
DFM notes, tooling and the document list in one reply – within one business day on weekdays.
Send drawings. Get a reviewed quote.
One business day response, engineering comments included. No account needed.
MOQ from prototype to seriesNDA on requestlesley@livoelectrical.com